Prepare • install • commission • maintain
Puroxi Installation Guide Centre
Interactive installation pathways for Puroxi equipment. The current product manual and project-specific design always control the final installation.
Puroxi Nano Bubble Nozzles
Preparation, pump and piping, gas to every port, installation, start-up, shutdown, cleaning, maintenance and safety.
- Confirm model and approved design
- Prepare site, power, water and safety controls
- Install every component before energizing
- Commission and record baseline readings
- Follow maintenance and inspection schedule
Quattro DB 360 Ultrasonic Algae Control
Float and suspension, shore power or approved solar, independent anchoring, positioning, start-up and inspection.
- Confirm model and approved design
- Prepare site, power, water and safety controls
- Install every component before energizing
- Commission and record baseline readings
- Follow maintenance and inspection schedule
Puroxi Oxygen Generator
Clean dry location, air preparation, oxygen delivery, ventilation, start-up, shutdown and oxygen safety.
- Confirm model and approved design
- Prepare site, power, water and safety controls
- Install every component before energizing
- Commission and record baseline readings
- Follow maintenance and inspection schedule
Puroxi Oxygen Booster Controlled Dosing
Water-test review, compatible dosing equipment, injection location, contact, monitoring, PPE and verification.
- Confirm model and approved design
- Prepare site, power, water and safety controls
- Install every component before energizing
- Commission and record baseline readings
- Follow maintenance and inspection schedule