Prepare • install • commission • maintain

Puroxi Installation Guide Centre

Interactive installation pathways for Puroxi equipment. The current product manual and project-specific design always control the final installation.

01

Puroxi Nano Bubble Nozzles

Preparation, pump and piping, gas to every port, installation, start-up, shutdown, cleaning, maintenance and safety.

  1. Confirm model and approved design
  2. Prepare site, power, water and safety controls
  3. Install every component before energizing
  4. Commission and record baseline readings
  5. Follow maintenance and inspection schedule

Open product guide →

02

Quattro DB 360 Ultrasonic Algae Control

Float and suspension, shore power or approved solar, independent anchoring, positioning, start-up and inspection.

  1. Confirm model and approved design
  2. Prepare site, power, water and safety controls
  3. Install every component before energizing
  4. Commission and record baseline readings
  5. Follow maintenance and inspection schedule

Open product guide →

03

Puroxi Oxygen Generator

Clean dry location, air preparation, oxygen delivery, ventilation, start-up, shutdown and oxygen safety.

  1. Confirm model and approved design
  2. Prepare site, power, water and safety controls
  3. Install every component before energizing
  4. Commission and record baseline readings
  5. Follow maintenance and inspection schedule

Open product guide →

04

Puroxi Oxygen Booster Controlled Dosing

Water-test review, compatible dosing equipment, injection location, contact, monitoring, PPE and verification.

  1. Confirm model and approved design
  2. Prepare site, power, water and safety controls
  3. Install every component before energizing
  4. Commission and record baseline readings
  5. Follow maintenance and inspection schedule

Open product guide →